Portfolio edition: Kith Climate cohort case, fictional client. Report date 16 October 2026.
Supporting evidence
Small grey tags are references to the project record: A- an assumption (assumption ledger, page 08), DR- a data request (page 11), D-5- a decision, DP- a data-plan item.
Week 5 data requests to Northwood (v2, 2026-10-16: v1 as frozen at G1, plus DR-10 and DR-11 (D-5-56), DR-12 (D-5-58), DR-13 (D-5-71), DR-7 narrowed (D-5-49) and DR-8 partly answered (D-5-50))
The gaps the physical-risk analysis names, in priority order. Each one is covered for now by a synthesised or assumed input (data-plan id in brackets). As at 16 October 2026, nothing here had been sent to Northwood.
| id | Request | Who likely holds it | Why it matters | Covered for now by | Status |
|---|---|---|---|---|---|
| DR-1 | Insurance schedule per company: property and BI limits, deductibles (incl. named-storm percentage deductibles), BI waiting periods, contingent BI cover, exclusions, renewal dates | Company CFOs or Northwood's broker | Decides the insured vs retained split for every scenario; the core of the insurance theme | Synthesised typical programme (DP-F4) | open |
| DR-2 | Sterling: superalloy (Inconel 718) safety stock, and time and cost to qualify an alternate supplier | Sterling operations and procurement | Sizes the headline dependency scenario; likely the weakest assumption | Literature range (DP-V5) | open |
| DR-3 | Revenue by site, and property and contents values by site | Company finance | Drives BI and damage losses at site level | Allocation by headcount and type (DP-E5); benchmark cost per sq ft (DP-E6) | open |
| DR-4 | Lease terms for leased sites: who rebuilds, who pays deductibles, rent abatement | Company finance or legal | Decides who bears damage at leased service sites | Proposed assumption, not yet agreed: tenant bears contents, landlord bears structure | open |
| DR-5 | Supplier lists for the eight companies without one (spend, share, location, alternates) | Company procurement | Replaces the synthetic supplier layers | Synthesised layers (DP-E3) | open |
| DR-6 | Backup power and water storage inventory by site | Company operations | Adaptive capacity; decides downtime under grid or water failure | Questionnaire statements only (DP-V4) | open |
| DR-7 | Covenant terms (maintenance tests and thresholds) for the seven companies without them in the data room (all but Sterling, Trident and NovaCare) | Northwood deal teams | Converts losses into covenant headroom and deal risk | Typical maintenance covenant (A-32); seeded for three companies (D-5-49) | open, narrowed |
| DR-8 | Ridgeline: claims history for the managed properties, and street addresses (see DR-10) | Ridgeline | Ridgeline's main exposure runs through its clients' assets | Property register found in the data room: 20 properties with value, fee, premium, deductible structure (D-5-50) | partly answered by the data room |
| DR-9 | Ridgeline: the Las Vegas office (opened January 2025), to be added to the facility file | Ridgeline | Missing site in the seeded data | Added from the questionnaire description | open |
| DR-10 | Street addresses for the 62 points the data room places only by city: 35 suppliers (Sterling, Harvest Ridge), 20 Ridgeline managed properties, Ridgeline's Las Vegas office, 6 pipeline sites | Sterling and Harvest Ridge procurement; Ridgeline; Northwood deal teams for the pipeline | Flood zone and site hazards cannot be set from a city alone | Flood status unknown, carried as a range from not in zone to in zone (D-5-56) | open |
| DR-11 | Flood zone determinations and flood cover for the 13 sites where the FEMA map and the company's statement disagree: NovaCare (8 clinics the map puts in AE or VE), Clearview Cincinnati (AE), Patriot Memphis and Jackson (stated AE, map none), Pinnacle Beaumont and Pasadena | Company CFOs and their brokers | A site believed to be outside a flood zone may carry no flood cover; decides retained flood loss | Range from not in zone to in zone; client finding (D-5-56; my-work/week-5/methodology/site-location-investigation-v2.md) | open |
| DR-12 | Patriot: is the Louisville branch (PSS-006) open? The submitted carbon template says it closed in August 2025; the questionnaire and org chart list it | Patriot finance or operations | Decides whether about $10.8M of allocated revenue is exposed at the site | Kept open; low case $0 (D-5-58) | open |
| DR-13 | Keystone: revenue lost per clinic closure day (or billed hours per clinic-day), and how the January 2025 figure of about 120 cancelled sessions was counted | Keystone finance or clinical operations | The session count implies about a third of the revenue per clinic-day that Keystone's reported revenue implies; decides how much a closure day costs Keystone and NovaCare-type clinic businesses | Clinic revenue at risk from the spine revenue; the event is excluded from the calibration pass test (D-5-71) | open |
Provenance: rendered for reading from
my-work/week-5/fund-level/data-requests-v2.md (frozen at G2/G3 on 16 October 2026; sha256 8345cc62d5e1), with the portfolio wording fixes listed in the portfolio changelog. Raw file: data/data-requests-v2.md.