Week 5 · Physical climate risk

Portfolio edition: Kith Climate cohort case, fictional client. Report date 16 October 2026.

Hand-off and re-run

Small grey tags are references to the project record: A- an assumption (assumption ledger, page 08), DR- a data request (page 11), D-5- a decision, DP- a data-plan item.

Week 5 to Week 6 hand-off (16 October 2026)

Historical hand-off, written on 16 October 2026 for the Week 6 work. Week 6 is complete; its outputs are in the Week 6 pages.

Week 6 writes an S2-style climate disclosure for Northwood from the Week 5 evidence. This note is for the fresh session that starts Week 6. It gives position, judgment and traps only. Facts are in the record: python3 my-work/framework/kernel-v2/kit_tools.py --week-dir my-work/week-5 query <id>. It supersedes the headline figures in my-work/week-5/handover/build-kickoff-notes-v2.md, which predate D-5-69 to D-5-77.

Position

Where the evidence is

Disclosure needWeek 5 source
Physical risks, by hazard and region, and which companies they touchmy-work/week-5/fund-level/register/vulnerability-register-v2.csv (223 rows, ranked by 1-in-50 gross loss, archetype per row)
Scenario analysis and resilienceSeven presets and the builder grid. Figures in my-work/week-5/fund-level/engine/outputs-v1.csv; grid in my-work/week-5/fund-level/engine/grid-hazard-v1.json and my-work/week-5/fund-level/engine/grid-dependency-v1.json
Current and anticipated financial effectsEvent loss by channel; who pays (insured, retained, renewal); covenant flags; recurring cost at exit and × exit multiple (outputs-v1.csv, engine summary)
Time horizonsThe hold period to each exit (Week 4 model) and the buyer's horizon, about 2035 to 2040. The buyer's horizon changes recurring heat cost only (method note, section 10)
Risk management: how risks are found and rankedmy-work/week-5/fund-level/leave-behind/method-note-v1.md, sections 3 and 9; the plausibility rule A-01
Actions and transition of the responsemy-work/week-5/fund-level/levers/lever-results-v1.csv (verdicts, owners, timing against exits); captive flag and Target B screen in my-work/week-5/fund-level/levers/portfolio-levers-v1.json
Assumptions, sources, sensitivity and limitsmy-work/week-5/fund-level/leave-behind/assumption-ledger-v1.csv, reference-data-index-v1.csv, sensitivity-v1.csv; calibration in my-work/week-5/fund-level/engine/calibration-groups-v1.csv; method note section 10
Data gaps to disclosemy-work/week-5/fund-level/data-requests-v2.md (DR-1 to DR-13)

Mapping to IFRS S2. The likely homes for this evidence:

Check every paragraph reference against the standard's text before citing it.

Headline figures (frozen, quote from the files)

The Friday answers say which of these to lead with.

Judgment to carry

Traps

Provenance: rendered for reading from my-work/week-5/handover/handoff-notes-v1.md (frozen at G2/G3 on 16 October 2026; sha256 1b2a92523b82), with the portfolio wording fixes listed in the portfolio changelog. Raw file: data/handoff-notes-v1.md.