Portfolio edition: Kith Climate cohort case, fictional client. Report date 16 October 2026.
Supporting evidence
Assumption ledger
Every assumption (A-) with its basis, how it was tested (calibrated, cited, sensitivity or judgment) and its status. Click a column heading to sort; on a phone each row shows as a card.
| assumption_id | assumption | value | unit | type | source | source_date | vintage_or_period | owner | used_in | status | note | treatment_group | treatment | engine_parameters_low_central_high | calibration | sensitivity |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A-01 | Plausibility floor: NRI annualized frequency for a hazard in at least one footprint county | 0.01 | events per year | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s3; plausibility-v1.csv | approved as a starting point at G1 (D-5-48) | Low enough to keep rare-but-real hazards | 4 | accepted as judgment | plausibility_floor 0.01/0.01/0.01 | ||
| A-02 | Severity intensities per hazard where no return-period source is fetched | see spec s3 table | intensity | assumed (cite) | to be cited per hazard (NOAA, NHC, US Drought Monitor) | 2026-10-16 | n/a | Daniel | spec s3 | approved as a starting point at G1 (D-5-48) | Replaced by fetched values where available | stated basis; see status | flood_depth_ft_10 0/0/0; flood_depth_ft_50 1.6/2.5/3.3; flood_depth_ft_100 3.3/5.0/6.6 | |||
| A-03 | Buyer's-horizon frequency factor for hurricane and convective | 1.0 to 1.3 | multiplier | assumed (cite) | literature range, e.g. IPCC AR6, to be cited; see prior-citations-v1.csv | 2026-10-16 | 2035 to 2040 | Daniel | spec s3 | approved as a starting point at G1 (D-5-48) | Winter held at 1.0 | 2 | fetched dated source | |||
| A-04 | Severity scale on base downtime | 1-in-10: 0.4; 1-in-100: 1.6 | multiplier | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s4.1 | approved as a starting point at G1 (D-5-48) | Calibrated by s9 | 1 | checked by calibration against the companies' own events (spec s9) | severity_scale_10 0.4/0.4/0.4; severity_scale_50 1.0/1.0/1.0; severity_scale_100 1.6/1.6/1.6 | G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band) | |
| A-05 | Base downtime days at 1-in-50 by facility class and hazard | see spec s4.1 table | days | assumed | Kith judgment; scout runs | 2026-10-16 | n/a | Daniel | spec s4.1 | approved as a starting point at G1 (D-5-48) | High-touch; calibrated by s9 | 1 | checked by calibration against the companies' own events (spec s9) | G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band) | ||
| A-06 | Client-driven shutdown multiplier, field operations | 2 to 3 | multiplier on hazard days | assumed (calibrated) | Pinnacle 2025: 9 days down for 3 days of storm (questionnaire) | 2026-10-16 | 2025 event | Daniel | spec s4.1 | approved as a starting point at G1 (D-5-48) | 1 | checked by calibration against the companies' own events (spec s9) | client_multiplier 2/2.5/3 | G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band) | ||
| A-07 | Supplier outage weeks when the supplier site is hit | 1-in-10: 1-3; 1-in-50: 4-12; 1-in-100: 8-26 | weeks | assumed (cite) | Kith judgment; to be cited against Gulf industrial recovery after major storms | 2026-10-16 | n/a | Daniel | spec s4.2 | approved as a starting point at G1 (D-5-48) | High-touch | 3 | visible range carried to every figure; one-at-a-time sensitivity | supplier_outage_weeks_10 1/2/3; supplier_outage_weeks_50 4/8/12; supplier_outage_weeks_100 8/17/26 | P1 Gulf landfall: fund gross loss: 4601887 / 6966703 / 9712199 USD | |
| A-08 | Substitution share by alternate status | none 0; in_qualification 0.25; qualified 0.6-0.9 | share | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s4.2 | approved as a starting point at G1 (D-5-48) | stated basis; see status | substitution_none 0/0/0; substitution_in_qualification 0.25/0.25/0.25; substitution_qualified 0.9/0.75/0.6 | ||||
| A-09 | Time to qualify an alternate aerospace superalloy supplier | 9 to 24 | months | assumed (cite) | Carpenter Technology 2015 press release (some approvals over 24 months); prior-citations-v1.csv | 2026-10-16 | n/a | Daniel | spec s4.2 | decided D-5-52 | Scouts identical: shared prior, not evidence; DR-2 | 2 | fetched dated source | requalification_weeks 39/71/104 | ||
| A-10 | Sterling Inconel-dependent revenue: aerospace share x Inconel share of aerospace parts | aerospace share seeded 28.1% to 64.9% (D-5-61) x Inconel-dependent parts 20 to 40% | share of revenue | assumed | Sterling financial-reporting/annual-budget-2026.md (aerospace share, seeded); Inconel-parts share assumed, DR-2 | 2026-10-16 | LTM Jan 2026 | Daniel | spec s4.2 | decided D-5-45, amended D-5-61 | Largest scout method gap; DR-2 | 3 | visible range carried to every figure; one-at-a-time sensitivity | P3 Sterling superalloy outage: Sterling gross loss: 1014248 / 2186080 / 3874896 USD | ||
| A-11 | Expediting cost on uncovered supplier spend | 5 to 15% | share of uncovered spend | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s4.2 | approved as a starting point at G1 (D-5-48) | 4 | accepted as judgment | expediting_share 0.05/0.10/0.15 | |||
| A-12 | Sterling superalloy safety stock | 6 to 14 | weeks | assumed | union of scout runs; DR-2 | 2026-10-16 | n/a | Daniel | spec s4.2 | approved as a starting point at G1 (D-5-48) | 3 | visible range carried to every figure; one-at-a-time sensitivity | sterling_superalloy_stock_weeks 14/10/6 | P3 Sterling superalloy outage: Sterling gross loss: 1556687 / 2186080 / 2815472 USD | ||
| A-13 | Central Valley severe-drought price rise on California-sourced inputs | 20 to 45% | share | assumed (cite) | to be cited (USDA, drought price episodes); see prior-citations-v1.csv | 2026-10-16 | n/a | Daniel | spec s4.3 | approved as a starting point at G1 (D-5-48) | 2 | fetched dated source | ca_drought_price_rise 0.20/0.325/0.45 | |||
| A-14 | Volume shortfall on sole or majority California suppliers in severe drought | 10 to 30% | share | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s4.3 | approved as a starting point at G1 (D-5-48) | stated basis; see status | ca_volume_shortfall 0.10/0.20/0.30 | ||||
| A-15 | Pass-through of input-cost rise to customers within the event | 20 to 50% | share | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s4.3 | approved as a starting point at G1 (D-5-48) | 3 | visible range carried to every figure; one-at-a-time sensitivity | ca_pass_through 0.50/0.35/0.20 | P4 Central Valley drought: Harvest Ridge gross loss: 8519062 / 11074781 / 13630500 USD | ||
| A-16 | Second drought season relative to the first | 1.0 to 1.5 | multiplier | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s4.3 | approved as a starting point at G1 (D-5-48) | stated basis; see status | second_season_factor 1.0/1.25/1.5 | ||||
| A-17 | All-risk property deductible by revenue band | $25k to $100k | USD per occurrence | synthesised | sector practice, to be cited | 2026-10-16 | n/a | Daniel | spec s5 | approved as a starting point at G1 (D-5-48) | DR-1 | stated basis; see status | property_deductible 25000/62500/100000 | |||
| A-18 | Named-storm deductible, coastal counties | 2 to 5% | share of insured value per site | synthesised (cite) | to be cited (broker market reports); see prior-citations-v1.csv | 2026-10-16 | n/a | Daniel | spec s5 | approved as a starting point at G1 (D-5-48) | DR-1 | 2 | fetched dated source | named_storm_deductible 0.02/0.035/0.05 | ||
| A-19 | Flood sublimit in zones A and V | $5M to $10M | USD | synthesised | sector practice | 2026-10-16 | n/a | Daniel | spec s5 | approved as a starting point at G1 (D-5-48) | DR-1 | 4 | accepted as judgment | flood_sublimit 10000000/7500000/5000000 | ||
| A-20 | BI waiting period | 72 | hours | synthesised | sector practice | 2026-10-16 | n/a | Daniel | spec s5 | approved as a starting point at G1 (D-5-48) | DR-1 | stated basis; see status | bi_waiting_days 3/3/3 | |||
| A-21 | Contingent BI sublimit, named suppliers only | $1M to $2.5M | USD | synthesised | sector practice | 2026-10-16 | n/a | Daniel | spec s5 | approved as a starting point at G1 (D-5-48) | DR-1 | stated basis; see status | cbi_sublimit 2500000/1750000/1000000 | |||
| A-22 | Hardened-market premium step | 10 to 20 inland; 20 to 35 Gulf and Southeast Atlantic coastal | percent | assumed (cite) | Marsh Global Insurance Market Index 2023 (US property +11 to 19% a quarter); prior-citations-v1.csv | 2026-10-16 | n/a | Daniel | spec s5 | decided D-5-52 | 2 | fetched dated source | hardened_premium_step_inland 0.10/0.15/0.20; hardened_premium_step_coastal 0.20/0.275/0.35 | |||
| A-23 | Post-claim renewal premium step | 10 to 25% | share | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s5 | approved as a starting point at G1 (D-5-48) | stated basis; see status | post_claim_premium_step 0.10/0.175/0.25 | ||||
| A-24 | Non-climate premium baseline growth | 3% | per year | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s6 | approved as a starting point at G1 (D-5-48) | Only the excess counts as recurring climate cost | stated basis; see status | premium_baseline_growth 0.03/0.03/0.03 | |||
| A-25 | Premium growth where no history | 5 to 8% | per year | assumed | Kith judgment; Week 4 benchmarks | 2026-10-16 | n/a | Daniel | spec s6 | approved as a starting point at G1 (D-5-48) | stated basis; see status | premium_growth_no_history 0.05/0.065/0.08 | ||||
| A-26 | Outdoor or field workforce share by company | Clearview 35-55% of cost of revenue; Pinnacle 60-80% of direct labour; Patriot 30-60% of seeded temporary payroll ($244.6M); Ridgeline 20-40% of cost of services | share of headcount | assumed | Kith judgment from questionnaires and KPIs | 2026-10-16 | n/a | Daniel | spec s6 | values set at step 2.4 (engine-parameters-v1.csv), group 3 | Set per company in the build, shown for review | 3 | visible range carried to every figure; one-at-a-time sensitivity | outdoor_share_clearview 0.35/0.45/0.55; outdoor_share_pinnacle 0.60/0.70/0.80; outdoor_share_patriot 0.30/0.45/0.60; outdoor_share_ridgeline 0.20/0.30/0.40 | P6 Southwest heat summer: fund gross loss: 159130 / 238694 / 318259 USD | |
| A-27 | Labour productivity loss on days over the heat threshold | 10 to 25% | share of the day | assumed (cite) | published heat-productivity curves, to be cited; see prior-citations-v1.csv | 2026-10-16 | n/a | Daniel | spec s6 | approved as a starting point at G1 (D-5-48) | 2 | fetched dated source | heat_productivity_loss 0.10/0.175/0.25 | |||
| A-28 | Cooling and water cost uplift in heat and water regions | 2 to 6% | share of facility or utility cost | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s6 | approved as a starting point at G1 (D-5-48) | 4 | accepted as judgment | cooling_uplift 0.02/0.04/0.06 | |||
| A-29 | Multiple compression on Gulf-exposed companies (overlay, off by default) | 0.25 to 0.5 | turns of EBITDA | assumed | scout run 1; Kith judgment | 2026-10-16 | n/a | Daniel | spec s6 | decided D-5-46: overlay shown, off by default | stated basis; see status | multiple_compression 0.25/0.375/0.5 | ||||
| A-30 | Share of lost revenue recovered within the period | manufacturing and food 0.5-0.9; clinics and staffing 0-0.2 | share | assumed (calibrated) | questionnaires: 'recovered within the month', 'within the week' | 2026-10-16 | 2023 to 2025 events | Daniel | spec s7 | approved as a starting point at G1 (D-5-48) | Recovered part is cash timing (D-5-27) | 1 | checked by calibration against the companies' own events (spec s9) | recovered_share_produce 0.9/0.7/0.5; recovered_share_serve 0.2/0.1/0.0 | G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band) | |
| A-31 | Recovery cost on recovered contribution | 10 to 25% | share | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s7 | approved as a starting point at G1 (D-5-48) | stated basis; see status | recovery_cost_share 0.10/0.175/0.25 | ||||
| A-32 | Covenant EBITDA cushion at entry | 25 to 35% | share of EBITDA | assumed | mid-market practice; DR-7 | 2026-10-16 | n/a | Daniel | spec s7 | approved as a starting point at G1 (D-5-48) | fallback only: seeded covenants for Sterling, Trident, NovaCare (D-5-49) | 3 | visible range carried to every figure; one-at-a-time sensitivity | covenant_cushion 0.35/0.30/0.25 | P4 Central Valley drought: Harvest Ridge covenant breach in the central case (cushion 35% / 30% / 25%): 1 / 1 / 1 flag | |
| A-33 | Calibration pass band | 0.5 to 2 | ratio model / reported | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | spec s9 | approved as a starting point at G1 (D-5-48) | stated basis; see status | calibration_band_low 0.5/0.5/0.5; calibration_band_high 2.0/2.0/2.0 | ||||
| A-34 | Lever cost ranges (lever library rows A-34 to A-39) | per lever in levers-v1.csv | USD | assumed | Kith judgment; to be cited where possible | 2026-10-16 | n/a | Daniel | spec s10 | approved as a starting point at G1 (D-5-48) | Rows A-35 to A-39 added with the lever library | stated basis; see status | ||||
| A-40 | Captive feasibility flag threshold: retained expected loss across companies | $2M a year | USD per year | assumed | Kith judgment: a rule of thumb for when pooling retained losses in a captive merits a feasibility study; to confirm with the Northwood CFO and broker (DR-1) | 2026-10-16 | n/a | Daniel | spec s10 | approved as a starting point at G1 (D-5-48) | stated basis; see status | |||||
| A-41 | Sector supplier templates for the eight synthesised layers | 28 supplier rows for 8 companies: my-work/week-5/methodology/synthesis-templates-v1.csv | categories and shares | synthesised | spine cost lines; data-room vendor mentions quoted and checked per row; hub cities assumed with stated reason | 2026-10-16 | LTM Jan 2026 | Daniel | spec s12 | synthesised, step 2.2 (run:5d2b6d33) | D-5-9 | stated basis; see status | ||||
| A-42 | Site revenue weight by facility type | 0.0 to 1.0 by facility type: my-work/week-5/methodology/site-class-map-v1.csv | factor on headcount | synthesised | Kith judgment | 2026-10-16 | n/a | Daniel | spec s12 | synthesised, step 2.2 (run:5d2b6d33) | Seeded plant revenue overrides (Harvest Ridge) | 4 | accepted as judgment | |||
| A-43 | Square feet per employee by facility type (asset value fallback) | low: Hazus NSI 2022 sq ft per employee (COM4 250, COM7 300, COM3 300, IND1 550, IND2 590, IND3 540); high: portfolio seeded median by class (office 600, clinic 152) or 2x Hazus | sq ft | assumed | FEMA Hazus 6 Inventory Technical Manual Table 5-4 (my-work/week-5/fund-level/inputs/fetched/hazus-valuation-v1.csv) | 2026-10-16 | n/a | Daniel | spec s12 | cited, step 2.2 | 4 | accepted as judgment | ||||
| A-44 | Revenue that depends on a depot or warehouse | low 25%, high 100% of the revenue of the company's field-operations sites (Sterling: plants) in the depot's region; central midpoint | share of served revenue | assumed | Kith judgment: equipment hire or direct shipping substitutes in part | 2026-10-16 | n/a | Daniel | register (step 2.3) | accepted D-5-64 | Sterling Canton, Clearview Dayton yard, Pinnacle Pasadena depot | stated basis; see status | depot_dependency_share 0.25/0.625/1.0 | |||
| A-45 | Wind damage ratio on structure and contents (hurricane in coastal regions; tornado and hail at 1-in-50 and up) | 1-in-10: 0 to 1%; 1-in-50: 2 to 8%; 1-in-100: 8 to 25% | share of value | assumed | Kith judgment: no Hazus wind curves fetched (DP-V1 covers flood only) | 2026-10-16 | n/a | Daniel | engine (step 2.4) | accepted D-5-68 | stated basis; see status | wind_damage_ratio_10 0.0/0.005/0.01; wind_damage_ratio_50 0.02/0.05/0.08; wind_damage_ratio_100 0.08/0.165/0.25 | ||||
| A-46 | Commercial electricity price for the cooling-uplift base | 0.12 to 0.16 | USD per kWh | assumed | Kith judgment; carbon template kWh is seeded | 2026-10-16 | n/a | Daniel | engine (step 2.4) | accepted D-5-68 | stated basis; see status | electricity_price 0.12/0.14/0.16 | ||||
| A-47 | Window in which lost output can be recovered (A-30 applies) | first 4 weeks of an outage | days | assumed | Kith judgment: catch-up capacity is limited | 2026-10-16 | n/a | Daniel | engine (step 2.4) | decided D-5-66 | stated basis; see status | recovery_window_days 28/28/28 | ||||
| A-48 | ABA therapy session length (to convert Keystone's cancelled sessions to dollars for calibration only) | 2 to 5, central 3.5 | hours per session | assumed | Kith judgment: clinic ABA sessions commonly run 2 to 4 hours, comprehensive programmes longer; the data room gives rates per hour but no session length | 2026-10-16 | n/a | Daniel | calibration replay (step 2.5) | proposed, delegated (D-5-65 delegation) | Used only to convert the reported 120 sessions; no engine output depends on it | stated basis; see status | ||||
| A-49 | Share of lost revenue recovered within the period for deferrable-work services (Pinnacle field testing; Patriot staffing; Ridgeline property services) | 0.5 to 0.9 | share | assumed (calibrated) | seeded: Pinnacle 2025 deferral 'recovered in Q1 2026'; Patriot 'Most was recovered within 2-4 weeks'; Ridgeline TI 'no scope or margin impact' | 2026-10-16 | 2025 to 2026 events | Daniel | engine (A-30 split) | decided D-5-73 (delegated) | Applies only within the A-47 4-week window; clinics and other services keep A-30 | stated basis; see status | recovered_share_deferrable 0.9/0.7/0.5 | |||
| A-35 | Supplier qualification cost | aerospace superalloy $250K-750K; food ingredient $50K-150K per supplier | USD one-off | assumed | Kith judgment: material testing, first-article and customer approval (aerospace); audit and specification (food) | 2026-10-16 | n/a | Daniel | levers-v1.csv (L-01; L-03) | accepted D-5-74 (delegated) | Time to qualify is A-09 for aerospace | stated basis; see status | ||||
| A-36 | Inventory carrying cost | 20 to 30% of stock value a year | share a year | assumed | Kith judgment: standard working-capital carrying-cost range | 2026-10-16 | n/a | Daniel | levers-v1.csv (L-02) | accepted D-5-74 (delegated) | stated basis; see status | |||||
| A-37 | Standby generation cost and effect | $0.4M-1.2M per plant; winter downtime cut 30-60% | USD one-off; share | assumed | Kith judgment: power was one of two stated causes of the 2024 Akron closure | 2026-10-16 | n/a | Daniel | levers-v1.csv (L-08) | accepted D-5-74 (delegated) | stated basis; see status | |||||
| A-38 | Client-shutdown continuity plan cost and effect | $75K-200K; client multiplier to 1.5-2x | USD one-off; multiplier | assumed | Kith judgment against A-06 (2-3x from Pinnacle 2025) | 2026-10-16 | n/a | Daniel | levers-v1.csv (L-04) | accepted D-5-74 (delegated) | stated basis; see status | |||||
| A-39 | Transfer pricing: parametric rate on line and deductible buy-down | parametric 8-15% of limit a year; deductible buy-down 10-20% of premium | share | assumed | Kith judgment | 2026-10-16 | n/a | Daniel | levers-v1.csv (L-05; L-06) | accepted D-5-74 (delegated) | DR-1 would replace with broker quotes | stated basis; see status | ||||
| A-50 | Portfolio insurance programme saving | 5 to 15% of premium | share | assumed | Kith judgment; needs renewal dates (DR-1) | 2026-10-16 | n/a | Daniel | levers-v1.csv (L-09) | accepted D-5-74 (delegated) | stated basis; see status |
Provenance: rendered for reading from
my-work/week-5/fund-level/leave-behind/assumption-ledger-v1.csv (frozen at G2/G3 on 16 October 2026; sha256 a38cff4a85fc), with the portfolio wording fixes listed in the portfolio changelog. Raw file: data/assumption-ledger-v1.csv.