Week 5 · Physical climate risk

Portfolio edition: Kith Climate cohort case, fictional client. Report date 16 October 2026.

Supporting evidence

Assumption ledger

Every assumption (A-) with its basis, how it was tested (calibrated, cited, sensitivity or judgment) and its status. Click a column heading to sort; on a phone each row shows as a card.

assumption_idassumptionvalueunittypesourcesource_datevintage_or_periodownerused_instatusnotetreatment_grouptreatmentengine_parameters_low_central_highcalibrationsensitivity
A-01Plausibility floor: NRI annualized frequency for a hazard in at least one footprint county0.01events per yearassumedKith judgment2026-10-16n/aDanielspec s3; plausibility-v1.csvapproved as a starting point at G1 (D-5-48)Low enough to keep rare-but-real hazards4accepted as judgmentplausibility_floor 0.01/0.01/0.01
A-02Severity intensities per hazard where no return-period source is fetchedsee spec s3 tableintensityassumed (cite)to be cited per hazard (NOAA, NHC, US Drought Monitor)2026-10-16n/aDanielspec s3approved as a starting point at G1 (D-5-48)Replaced by fetched values where availablestated basis; see statusflood_depth_ft_10 0/0/0; flood_depth_ft_50 1.6/2.5/3.3; flood_depth_ft_100 3.3/5.0/6.6
A-03Buyer's-horizon frequency factor for hurricane and convective1.0 to 1.3multiplierassumed (cite)literature range, e.g. IPCC AR6, to be cited; see prior-citations-v1.csv2026-10-162035 to 2040Danielspec s3approved as a starting point at G1 (D-5-48)Winter held at 1.02fetched dated source
A-04Severity scale on base downtime1-in-10: 0.4; 1-in-100: 1.6multiplierassumedKith judgment2026-10-16n/aDanielspec s4.1approved as a starting point at G1 (D-5-48)Calibrated by s91checked by calibration against the companies' own events (spec s9)severity_scale_10 0.4/0.4/0.4; severity_scale_50 1.0/1.0/1.0; severity_scale_100 1.6/1.6/1.6G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band)
A-05Base downtime days at 1-in-50 by facility class and hazardsee spec s4.1 tabledaysassumedKith judgment; scout runs2026-10-16n/aDanielspec s4.1approved as a starting point at G1 (D-5-48)High-touch; calibrated by s91checked by calibration against the companies' own events (spec s9)G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band)
A-06Client-driven shutdown multiplier, field operations2 to 3multiplier on hazard daysassumed (calibrated)Pinnacle 2025: 9 days down for 3 days of storm (questionnaire)2026-10-162025 eventDanielspec s4.1approved as a starting point at G1 (D-5-48)1checked by calibration against the companies' own events (spec s9)client_multiplier 2/2.5/3G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band)
A-07Supplier outage weeks when the supplier site is hit1-in-10: 1-3; 1-in-50: 4-12; 1-in-100: 8-26weeksassumed (cite)Kith judgment; to be cited against Gulf industrial recovery after major storms2026-10-16n/aDanielspec s4.2approved as a starting point at G1 (D-5-48)High-touch3visible range carried to every figure; one-at-a-time sensitivitysupplier_outage_weeks_10 1/2/3; supplier_outage_weeks_50 4/8/12; supplier_outage_weeks_100 8/17/26P1 Gulf landfall: fund gross loss: 4601887 / 6966703 / 9712199 USD
A-08Substitution share by alternate statusnone 0; in_qualification 0.25; qualified 0.6-0.9shareassumedKith judgment2026-10-16n/aDanielspec s4.2approved as a starting point at G1 (D-5-48)stated basis; see statussubstitution_none 0/0/0; substitution_in_qualification 0.25/0.25/0.25; substitution_qualified 0.9/0.75/0.6
A-09Time to qualify an alternate aerospace superalloy supplier9 to 24monthsassumed (cite)Carpenter Technology 2015 press release (some approvals over 24 months); prior-citations-v1.csv2026-10-16n/aDanielspec s4.2decided D-5-52Scouts identical: shared prior, not evidence; DR-22fetched dated sourcerequalification_weeks 39/71/104
A-10Sterling Inconel-dependent revenue: aerospace share x Inconel share of aerospace partsaerospace share seeded 28.1% to 64.9% (D-5-61) x Inconel-dependent parts 20 to 40%share of revenueassumedSterling financial-reporting/annual-budget-2026.md (aerospace share, seeded); Inconel-parts share assumed, DR-22026-10-16LTM Jan 2026Danielspec s4.2decided D-5-45, amended D-5-61Largest scout method gap; DR-23visible range carried to every figure; one-at-a-time sensitivityP3 Sterling superalloy outage: Sterling gross loss: 1014248 / 2186080 / 3874896 USD
A-11Expediting cost on uncovered supplier spend5 to 15%share of uncovered spendassumedKith judgment2026-10-16n/aDanielspec s4.2approved as a starting point at G1 (D-5-48)4accepted as judgmentexpediting_share 0.05/0.10/0.15
A-12Sterling superalloy safety stock6 to 14weeksassumedunion of scout runs; DR-22026-10-16n/aDanielspec s4.2approved as a starting point at G1 (D-5-48)3visible range carried to every figure; one-at-a-time sensitivitysterling_superalloy_stock_weeks 14/10/6P3 Sterling superalloy outage: Sterling gross loss: 1556687 / 2186080 / 2815472 USD
A-13Central Valley severe-drought price rise on California-sourced inputs20 to 45%shareassumed (cite)to be cited (USDA, drought price episodes); see prior-citations-v1.csv2026-10-16n/aDanielspec s4.3approved as a starting point at G1 (D-5-48)2fetched dated sourceca_drought_price_rise 0.20/0.325/0.45
A-14Volume shortfall on sole or majority California suppliers in severe drought10 to 30%shareassumedKith judgment2026-10-16n/aDanielspec s4.3approved as a starting point at G1 (D-5-48)stated basis; see statusca_volume_shortfall 0.10/0.20/0.30
A-15Pass-through of input-cost rise to customers within the event20 to 50%shareassumedKith judgment2026-10-16n/aDanielspec s4.3approved as a starting point at G1 (D-5-48)3visible range carried to every figure; one-at-a-time sensitivityca_pass_through 0.50/0.35/0.20P4 Central Valley drought: Harvest Ridge gross loss: 8519062 / 11074781 / 13630500 USD
A-16Second drought season relative to the first1.0 to 1.5multiplierassumedKith judgment2026-10-16n/aDanielspec s4.3approved as a starting point at G1 (D-5-48)stated basis; see statussecond_season_factor 1.0/1.25/1.5
A-17All-risk property deductible by revenue band$25k to $100kUSD per occurrencesynthesisedsector practice, to be cited2026-10-16n/aDanielspec s5approved as a starting point at G1 (D-5-48)DR-1stated basis; see statusproperty_deductible 25000/62500/100000
A-18Named-storm deductible, coastal counties2 to 5%share of insured value per sitesynthesised (cite)to be cited (broker market reports); see prior-citations-v1.csv2026-10-16n/aDanielspec s5approved as a starting point at G1 (D-5-48)DR-12fetched dated sourcenamed_storm_deductible 0.02/0.035/0.05
A-19Flood sublimit in zones A and V$5M to $10MUSDsynthesisedsector practice2026-10-16n/aDanielspec s5approved as a starting point at G1 (D-5-48)DR-14accepted as judgmentflood_sublimit 10000000/7500000/5000000
A-20BI waiting period72hourssynthesisedsector practice2026-10-16n/aDanielspec s5approved as a starting point at G1 (D-5-48)DR-1stated basis; see statusbi_waiting_days 3/3/3
A-21Contingent BI sublimit, named suppliers only$1M to $2.5MUSDsynthesisedsector practice2026-10-16n/aDanielspec s5approved as a starting point at G1 (D-5-48)DR-1stated basis; see statuscbi_sublimit 2500000/1750000/1000000
A-22Hardened-market premium step10 to 20 inland; 20 to 35 Gulf and Southeast Atlantic coastalpercentassumed (cite)Marsh Global Insurance Market Index 2023 (US property +11 to 19% a quarter); prior-citations-v1.csv2026-10-16n/aDanielspec s5decided D-5-522fetched dated sourcehardened_premium_step_inland 0.10/0.15/0.20; hardened_premium_step_coastal 0.20/0.275/0.35
A-23Post-claim renewal premium step10 to 25%shareassumedKith judgment2026-10-16n/aDanielspec s5approved as a starting point at G1 (D-5-48)stated basis; see statuspost_claim_premium_step 0.10/0.175/0.25
A-24Non-climate premium baseline growth3%per yearassumedKith judgment2026-10-16n/aDanielspec s6approved as a starting point at G1 (D-5-48)Only the excess counts as recurring climate coststated basis; see statuspremium_baseline_growth 0.03/0.03/0.03
A-25Premium growth where no history5 to 8%per yearassumedKith judgment; Week 4 benchmarks2026-10-16n/aDanielspec s6approved as a starting point at G1 (D-5-48)stated basis; see statuspremium_growth_no_history 0.05/0.065/0.08
A-26Outdoor or field workforce share by companyClearview 35-55% of cost of revenue; Pinnacle 60-80% of direct labour; Patriot 30-60% of seeded temporary payroll ($244.6M); Ridgeline 20-40% of cost of servicesshare of headcountassumedKith judgment from questionnaires and KPIs2026-10-16n/aDanielspec s6values set at step 2.4 (engine-parameters-v1.csv), group 3Set per company in the build, shown for review3visible range carried to every figure; one-at-a-time sensitivityoutdoor_share_clearview 0.35/0.45/0.55; outdoor_share_pinnacle 0.60/0.70/0.80; outdoor_share_patriot 0.30/0.45/0.60; outdoor_share_ridgeline 0.20/0.30/0.40P6 Southwest heat summer: fund gross loss: 159130 / 238694 / 318259 USD
A-27Labour productivity loss on days over the heat threshold10 to 25%share of the dayassumed (cite)published heat-productivity curves, to be cited; see prior-citations-v1.csv2026-10-16n/aDanielspec s6approved as a starting point at G1 (D-5-48)2fetched dated sourceheat_productivity_loss 0.10/0.175/0.25
A-28Cooling and water cost uplift in heat and water regions2 to 6%share of facility or utility costassumedKith judgment2026-10-16n/aDanielspec s6approved as a starting point at G1 (D-5-48)4accepted as judgmentcooling_uplift 0.02/0.04/0.06
A-29Multiple compression on Gulf-exposed companies (overlay, off by default)0.25 to 0.5turns of EBITDAassumedscout run 1; Kith judgment2026-10-16n/aDanielspec s6decided D-5-46: overlay shown, off by defaultstated basis; see statusmultiple_compression 0.25/0.375/0.5
A-30Share of lost revenue recovered within the periodmanufacturing and food 0.5-0.9; clinics and staffing 0-0.2shareassumed (calibrated)questionnaires: 'recovered within the month', 'within the week'2026-10-162023 to 2025 eventsDanielspec s7approved as a starting point at G1 (D-5-48)Recovered part is cash timing (D-5-27)1checked by calibration against the companies' own events (spec s9)recovered_share_produce 0.9/0.7/0.5; recovered_share_serve 0.2/0.1/0.0G-PTI-2025 0.92x pass; G-PTI-2023 1.17x pass; G-SPM-2024 1.41x pass; G-HRF-2025 1.70x pass; G-PSS-2025 0.57x pass; G-NC-2023 1.85x pass; G-NC-2025 1.59x pass; G-KBH-2025 3.26x excluded (outside band); G-RPS-2026 0.36x excluded (outside band)
A-31Recovery cost on recovered contribution10 to 25%shareassumedKith judgment2026-10-16n/aDanielspec s7approved as a starting point at G1 (D-5-48)stated basis; see statusrecovery_cost_share 0.10/0.175/0.25
A-32Covenant EBITDA cushion at entry25 to 35%share of EBITDAassumedmid-market practice; DR-72026-10-16n/aDanielspec s7approved as a starting point at G1 (D-5-48)fallback only: seeded covenants for Sterling, Trident, NovaCare (D-5-49)3visible range carried to every figure; one-at-a-time sensitivitycovenant_cushion 0.35/0.30/0.25P4 Central Valley drought: Harvest Ridge covenant breach in the central case (cushion 35% / 30% / 25%): 1 / 1 / 1 flag
A-33Calibration pass band0.5 to 2ratio model / reportedassumedKith judgment2026-10-16n/aDanielspec s9approved as a starting point at G1 (D-5-48)stated basis; see statuscalibration_band_low 0.5/0.5/0.5; calibration_band_high 2.0/2.0/2.0
A-34Lever cost ranges (lever library rows A-34 to A-39)per lever in levers-v1.csvUSDassumedKith judgment; to be cited where possible2026-10-16n/aDanielspec s10approved as a starting point at G1 (D-5-48)Rows A-35 to A-39 added with the lever librarystated basis; see status
A-40Captive feasibility flag threshold: retained expected loss across companies$2M a yearUSD per yearassumedKith judgment: a rule of thumb for when pooling retained losses in a captive merits a feasibility study; to confirm with the Northwood CFO and broker (DR-1)2026-10-16n/aDanielspec s10approved as a starting point at G1 (D-5-48)stated basis; see status
A-41Sector supplier templates for the eight synthesised layers28 supplier rows for 8 companies: my-work/week-5/methodology/synthesis-templates-v1.csvcategories and sharessynthesisedspine cost lines; data-room vendor mentions quoted and checked per row; hub cities assumed with stated reason2026-10-16LTM Jan 2026Danielspec s12synthesised, step 2.2 (run:5d2b6d33)D-5-9stated basis; see status
A-42Site revenue weight by facility type0.0 to 1.0 by facility type: my-work/week-5/methodology/site-class-map-v1.csvfactor on headcountsynthesisedKith judgment2026-10-16n/aDanielspec s12synthesised, step 2.2 (run:5d2b6d33)Seeded plant revenue overrides (Harvest Ridge)4accepted as judgment
A-43Square feet per employee by facility type (asset value fallback)low: Hazus NSI 2022 sq ft per employee (COM4 250, COM7 300, COM3 300, IND1 550, IND2 590, IND3 540); high: portfolio seeded median by class (office 600, clinic 152) or 2x Hazussq ftassumedFEMA Hazus 6 Inventory Technical Manual Table 5-4 (my-work/week-5/fund-level/inputs/fetched/hazus-valuation-v1.csv)2026-10-16n/aDanielspec s12cited, step 2.24accepted as judgment
A-44Revenue that depends on a depot or warehouselow 25%, high 100% of the revenue of the company's field-operations sites (Sterling: plants) in the depot's region; central midpointshare of served revenueassumedKith judgment: equipment hire or direct shipping substitutes in part2026-10-16n/aDanielregister (step 2.3)accepted D-5-64Sterling Canton, Clearview Dayton yard, Pinnacle Pasadena depotstated basis; see statusdepot_dependency_share 0.25/0.625/1.0
A-45Wind damage ratio on structure and contents (hurricane in coastal regions; tornado and hail at 1-in-50 and up)1-in-10: 0 to 1%; 1-in-50: 2 to 8%; 1-in-100: 8 to 25%share of valueassumedKith judgment: no Hazus wind curves fetched (DP-V1 covers flood only)2026-10-16n/aDanielengine (step 2.4)accepted D-5-68stated basis; see statuswind_damage_ratio_10 0.0/0.005/0.01; wind_damage_ratio_50 0.02/0.05/0.08; wind_damage_ratio_100 0.08/0.165/0.25
A-46Commercial electricity price for the cooling-uplift base0.12 to 0.16USD per kWhassumedKith judgment; carbon template kWh is seeded2026-10-16n/aDanielengine (step 2.4)accepted D-5-68stated basis; see statuselectricity_price 0.12/0.14/0.16
A-47Window in which lost output can be recovered (A-30 applies)first 4 weeks of an outagedaysassumedKith judgment: catch-up capacity is limited2026-10-16n/aDanielengine (step 2.4)decided D-5-66stated basis; see statusrecovery_window_days 28/28/28
A-48ABA therapy session length (to convert Keystone's cancelled sessions to dollars for calibration only)2 to 5, central 3.5hours per sessionassumedKith judgment: clinic ABA sessions commonly run 2 to 4 hours, comprehensive programmes longer; the data room gives rates per hour but no session length2026-10-16n/aDanielcalibration replay (step 2.5)proposed, delegated (D-5-65 delegation)Used only to convert the reported 120 sessions; no engine output depends on itstated basis; see status
A-49Share of lost revenue recovered within the period for deferrable-work services (Pinnacle field testing; Patriot staffing; Ridgeline property services)0.5 to 0.9shareassumed (calibrated)seeded: Pinnacle 2025 deferral 'recovered in Q1 2026'; Patriot 'Most was recovered within 2-4 weeks'; Ridgeline TI 'no scope or margin impact'2026-10-162025 to 2026 eventsDanielengine (A-30 split)decided D-5-73 (delegated)Applies only within the A-47 4-week window; clinics and other services keep A-30stated basis; see statusrecovered_share_deferrable 0.9/0.7/0.5
A-35Supplier qualification costaerospace superalloy $250K-750K; food ingredient $50K-150K per supplierUSD one-offassumedKith judgment: material testing, first-article and customer approval (aerospace); audit and specification (food)2026-10-16n/aDaniellevers-v1.csv (L-01; L-03)accepted D-5-74 (delegated)Time to qualify is A-09 for aerospacestated basis; see status
A-36Inventory carrying cost20 to 30% of stock value a yearshare a yearassumedKith judgment: standard working-capital carrying-cost range2026-10-16n/aDaniellevers-v1.csv (L-02)accepted D-5-74 (delegated)stated basis; see status
A-37Standby generation cost and effect$0.4M-1.2M per plant; winter downtime cut 30-60%USD one-off; shareassumedKith judgment: power was one of two stated causes of the 2024 Akron closure2026-10-16n/aDaniellevers-v1.csv (L-08)accepted D-5-74 (delegated)stated basis; see status
A-38Client-shutdown continuity plan cost and effect$75K-200K; client multiplier to 1.5-2xUSD one-off; multiplierassumedKith judgment against A-06 (2-3x from Pinnacle 2025)2026-10-16n/aDaniellevers-v1.csv (L-04)accepted D-5-74 (delegated)stated basis; see status
A-39Transfer pricing: parametric rate on line and deductible buy-downparametric 8-15% of limit a year; deductible buy-down 10-20% of premiumshareassumedKith judgment2026-10-16n/aDaniellevers-v1.csv (L-05; L-06)accepted D-5-74 (delegated)DR-1 would replace with broker quotesstated basis; see status
A-50Portfolio insurance programme saving5 to 15% of premiumshareassumedKith judgment; needs renewal dates (DR-1)2026-10-16n/aDaniellevers-v1.csv (L-09)accepted D-5-74 (delegated)stated basis; see status
Provenance: rendered for reading from my-work/week-5/fund-level/leave-behind/assumption-ledger-v1.csv (frozen at G2/G3 on 16 October 2026; sha256 a38cff4a85fc), with the portfolio wording fixes listed in the portfolio changelog. Raw file: data/assumption-ledger-v1.csv.