Pinnacle Testing & Inspection: climate review for the Board

Annual review, calendar 2025 data. Prepared by Northwood Capital for this company's board. Northwood sponsor representative: Andrew Walsh. Report date 2026-11-08.

What the board needs to know

$1.8M
expected cost of physical climate risk over the hold to exit, central case, before insurance (range $0.5M to $4.3M).
$1.5M a year
recurring heat cost a buyer may see at exit (range $0.9M to $2.2M). At the 8.5x exit multiple that is about $12.5M of value a buyer may take off the price.
$1.0M a year
expected cost across weather, energy, insurance, supplier and water exposure: 5.0% of EBITDA ($20.1M).
The footprint is measured and the money at risk is sized. No climate target exists at this company, and no board or management role owns climate today. This page says so plainly because a buyer will ask.

Emissions and energy, each beside its cost

MeasureCalendar 2025What it costs or risks
Direct emissions from fuel burned on site and in vehicles (Scope 1)2,106 tIncluded in the total below
Emissions from purchased electricity (Scope 2)369 tIncluded in the total below
Total emissions2,475 tCost of the emissions themselves: carbon-price exposure overlaps the energy-price line below and is not shown separately
Emissions per $M of revenue21.5 tRevenue is $115.0M; intensity lets a buyer compare cost to size (peer comparison: see below)
Energy used9,700 MWhEnergy-price exposure: $3K a year, 0.0% of EBITDA
Change from last yearn/aThis is the first year measured, so it is the baseline. Effect not quantified: there is nothing yet to compare against.

A tonne of CO2e is a tonne of carbon dioxide or its warming equivalent. Data quality is graded B (28.5% of emissions from utility bills, 70.5% from accounting estimates, 1.0% from landlord or proxy data).

Risk profile in dollars

ExposureExpected cost a yearShare of EBITDA
Weather and physical damage$0.5M2.3%
Energy prices$3K0.0%
Insurance cost$0.2M1.1%
Supplier disruption$0.3M1.7%
Water$0.0M0.0%
Total of the five lines$1.0M5.0%
Customer demand for carbon data (a what-if: everything lost, not an expected cost)$0.7M3.7%

Physical climate risk over the hold to exit: $0.5M to $4.3M, central $1.8M, before insurance. These are expected values, not forecasts. Insurance recoveries are not netted and who would pay is estimated by rule. The headline figure at the top is the central expected cost over the whole holding period from the physical-risk model; the table gives the expected cost per year by type of exposure from the exposure model. The two come from different models and are not added together.

Action plan

MeasureStatusCostSaving a yearRisk it reduces
LED lighting upgrades at Houston HQ and Pasadena depot (done 2024)not quantified$0.0M$0.0Menergy price shock

Progress against plan cannot be shown: this is the first year, nothing has a baseline, and spend actually made in 2025 has not been collected. No measure on this list addresses the largest exposure (weather and physical damage, $0.5M a year).

How this compares with peers

No public benchmark can be calculated for this company from EPA or ENERGY STAR data. Sites are field bases, regional offices and an equipment depot; the data room has no floor areas, and the national median table has no field base or depot. Northwood does not compare this company with its other companies.

What we ask of management

Sources: this company's 2025 energy and fuel submission and climate questionnaire, and Northwood's emissions, exposure and physical-risk analysis. Figure-level references are in the data file kept with this page.