Meridian Business Solutions: climate review for the Board

Annual review, calendar 2025 data. Prepared by Northwood Capital for this company's board. Northwood sponsor representative: Mark Sullivan. Report date 2026-11-08.

What the board needs to know

$0.5M
expected cost of physical climate risk over the hold to exit, central case, before insurance (range $0.2M to $1.0M).
$42K a year
recurring heat cost a buyer may see at exit (range $24K to $0.1M). At the 9.5x exit multiple that is about $0.4M of value a buyer may take off the price.
$0.4M a year
expected cost across weather, energy, insurance, supplier and water exposure: 0.9% of EBITDA ($38.3M).
The footprint is measured and the money at risk is sized. No climate target exists at this company, and no board or management role owns climate today. This page says so plainly because a buyer will ask.

Emissions and energy, each beside its cost

MeasureCalendar 2025What it costs or risks
Direct emissions from fuel burned on site and in vehicles (Scope 1)718 tIncluded in the total below
Emissions from purchased electricity (Scope 2)1,004 tIncluded in the total below
Total emissions1,722 tCost of the emissions themselves: carbon-price exposure overlaps the energy-price line below and is not shown separately
Emissions per $M of revenue7.7 tRevenue is $225.0M; intensity lets a buyer compare cost to size (peer comparison: see below)
Energy used6,603 MWhEnergy-price exposure: $27K a year, 0.1% of EBITDA
Change from last yearn/aThis is the first year measured, so it is the baseline. Effect not quantified: there is nothing yet to compare against.

A tonne of CO2e is a tonne of carbon dioxide or its warming equivalent. Data quality is graded A (80.6% of emissions from utility bills, 19.4% from accounting estimates, 0.0% from landlord or proxy data).

Risk profile in dollars

ExposureExpected cost a yearShare of EBITDA
Weather and physical damage$0.0M0.0%
Energy prices$27K0.1%
Insurance cost$10K0.0%
Supplier disruption$0.3M0.8%
Water$0.0M0.0%
Total of the five lines$0.4M0.9%
Customer demand for carbon data (a what-if: everything lost, not an expected cost)$0.2M0.5%

Physical climate risk over the hold to exit: $0.2M to $1.0M, central $0.5M, before insurance. These are expected values, not forecasts. Insurance recoveries are not netted and who would pay is estimated by rule. The headline figure at the top is the central expected cost over the whole holding period from the physical-risk model; the table gives the expected cost per year by type of exposure from the exposure model. The two come from different models and are not added together.

Action plan

No measure has been identified yet. Effect not quantified.

Progress against plan cannot be shown: this is the first year, nothing has a baseline, and spend actually made in 2025 has not been collected. No measure on this list addresses the largest exposure (supplier disruption, $0.3M a year).

How this compares with peers

SiteFloor area (sq ft)Energy used per sq ft (kBtu, a unit of energy)US office median (kBtu)Times the median
Head office42,00087.452.91.7x

Public benchmark: ENERGY STAR national median energy use per square foot for US offices, from https://www.energystar.gov/buildings/benchmark/understand-metrics/what-eui, retrieved 2026-11-06; the page does not state the year of the data. Energy is building electricity and gas for 2025 from utility bills, converted to kBtu. This covers 1 of 16 sites: no other site has both a floor area and metered energy. Whether the floor area is the same space the bills cover has not been confirmed with management. Effect not quantified: sizing the saving needs the site's utility cost. Northwood does not compare this company with its other companies.

What we ask of management

Sources: this company's 2025 energy and fuel submission and climate questionnaire, and Northwood's emissions, exposure and physical-risk analysis. Figure-level references are in the data file kept with this page.