Week 4: Materiality and initiatives

Reading view of a Markdown deliverable, shown as delivered. Download the Markdown file.

Week 4 data files

Portfolio edition: Kith Climate cohort case, fictional client. These are the CSV files delivered with the Week 4 work for Northwood Capital, unchanged, so the re-run steps still work. Report date 9 October 2026.

Read this first

Files

connected-dataset-lineage-v4.csv

Where each value in the connected dataset came from: file, line and grade.

Columns: company_slug, field, value, unit, period, file, line, source_ref, file_sha256_12, data_grade, basis, note

connected-dataset-v4.csv

Each company's Week 3 carbon footprint beside its financials (revenue, EBITDA, margin, exit multiple, remaining hold).

Columns: company_slug, week3_slug, spine_slug, sector, acq_date, priority_company, carbon_period, scope1_t_co2e, scope2_t_co2e, scope12_t_co2e_low, scope12_t_co2e_base, scope12_t_co2e_high, scope12_t_co2e_base_ownership, carbon_label, financial_period, ltm_revenue_usd_m, ltm_adj_ebitda_usd_m, headcount, gross_margin_pct, gross_margin_period, exit_multiple, remaining_hold_n_years, gross_margin_pct_basis, exit_multiple_basis, remaining_hold_n_years_basis

d4-matrix-v5.csv

Each exposure placed on the materiality matrix (likelihood band, severity band, priority).

Columns: company_slug, risk, revenue_type, case, status, likelihood_band, severity_band, priority, impact_usd, p_annual_mid, expected_loss_mid_usd, expected_loss_low_edge_usd, expected_loss_high_edge_usd, note

d4-summary-v5.csv

Company totals: expected loss (mid, low, high, half lost) and the efficiency measures' cost, saving and exit value.

Columns: company_slug, ltm_adj_ebitda_usd, measures_cost_usd, measures_saving_usd, measures_exit_value_usd, expected_loss_mid_usd, expected_loss_low_usd, expected_loss_high_usd, expected_loss_half_case_mid_usd, lines_not_quantified, company_plan_measure, note

d5-initiatives-v6.csv

Every initiative considered, with its source, cost and saving ranges.

Columns: company_slug, initiative, source_kind, source_ref, status, fuel, cost_low_usd, cost_high_usd, savings_low_usd, savings_high_usd, eia_price_ratio, risk_addressed, risk_avoided_usd, risk_avoided_low_edge_usd, risk_avoided_high_edge_usd, exit_multiple, gas_flag, derivation, revenue_type

d5-ranking-v6.csv

The initiative ranking: payback, NPV at 8, 10 and 15 percent, risk avoided and exit value effect.

Columns: company_slug, rank, status, initiative, source_kind, n_years, cost_low_usd, cost_high_usd, savings_low_usd, savings_high_usd, case, cost_used_usd, savings_used_usd, savings_basis, escalation_rate, roi, payback_years, payback_exceeds_n, npv_8, npv_10, npv_15, risk_avoided_usd, exit_value_effect_usd, exit_lead, gas_flag, sensitivity_flag, npv_lineage

d5-value-protected-v6.csv

Cost of answering customers' carbon-data requests, and the expected loss it reduces.

Columns: company_slug, action, revenue_type, what_the_customers_ask, components_in_base, optional_not_in_base, effort_days_low, effort_days_central, effort_days_high, day_rate_low_usd, day_rate_central_usd, day_rate_high_usd, cost_low_usd, cost_central_usd, cost_high_usd, value_protected_per_year_everything_lost_usd, value_protected_per_year_half_lost_usd, payback_days_central_vs_half_lost, payback_days_high_cost_vs_half_lost, exit_value_effect_what_if_usd, exit_value_effect_half_lost_what_if_usd, value_label, label, not_covered, source

exposure-lines-v6.csv

The exposure model's workings: one row per company and risk (62 rows; Harvest Ridge has two extra water lines).

Columns: company_slug, risk, label, status, period, indicator_level, indicator_fact, grade, dollar_suffix, flag_impact, flag_probability, lineage, note, period_ebitda, ltm_adj_ebitda_usd, report_date, impact_usd, impact_pct_ebitda, severity_band, one_off, likelihood_band, n_years, p_hold_midpoint, p_annual_mid, p_annual_low_edge, p_annual_high_edge, expected_loss_mid_usd, expected_loss_low_edge_usd, expected_loss_high_edge_usd, value_at_risk_what_if_usd, freq_own, freq_pooled, freq_fema, freq_range_per_year, band_own, band_pooled, band_fema, band_rubric, disagreement_flag, stability, expected_loss_rate_low_usd, expected_loss_rate_high_usd, impact_high_scope_usd, impact_pct_ebitda_high_scope, severity_band_high_scope, expected_loss_high_scope_usd, value_at_risk_half_lost_what_if_usd, revenue_type, case_everything_lost_expected_loss_usd, case_half_lost_impact_usd, case_half_lost_expected_loss_usd, half_lost_label, impact_low_usd, impact_high_usd, expected_loss_range_usd, gas_flag, impact_upper_bound_usd, uses_simulated

exposure-summary-v6.csv

Expected loss a year per company, split by type of exposure.

Columns: company_slug, ltm_adj_ebitda_usd, lines_quantified, customer_requirement_expected_loss_usd, physical_expected_loss_usd, energy_expected_loss_usd, insurance_expected_loss_usd, supplier_expected_loss_usd, water_expected_loss_usd, carbon_expected_loss_usd, largest_line, largest_line_revenue_type, largest_line_expected_loss_usd, note

revision-benchmarks-v1.csv

Outside benchmarks used for grade C estimates, with source, URL and retrieval date.

Columns: id, value, unit, n, source, url, vintage, retrieved, quote, use

revision-validation-v1.csv

How each benchmark estimate was cross-checked.

Columns: estimate, method, input, cross_check, result, reading

simulated-extended-data-v1.csv

A simulated water and site baseline for Harvest Ridge Foods, labelled SIMULATED and kept out of every other figure.