All ten companies, one backlog, sized, with the cost to act beside the exposure. Move the exit year to see the book a buyer would look at by then; move the two thresholds to change where large and likely begin.
Companies sit at their modelled exit: Kith's model, not a Northwood plan, and the earliest modelled date where a hold is a floor. The shaded band is the book at the chosen exit year; click a company for its page.
Each point is one exposure at one company: its chance over the remaining hold against its impact as a share of EBITDA. Dashed lines are the thresholds above. Carbon-price scenarios are not plotted: they overlap the energy line.
Hover a point for the fact behind it; click it for the company page.
Quickest payback first, with revenue earned today ahead of revenue not yet won. Open a card for who decides, who delivers and the first move.
| Estimate | How it was made | What it rests on | Cross-check | Result |
|---|---|---|---|---|
| Insurance premium (four companies with no premium figure; Keystone uses its own $285,000 premium as the base; its $20K† line is the estimated increase) | Median of the five portfolio companies that state a 2025 premium, as a share of LTM revenue, times the US casualty rate change, applied to the whole premium as an upper bound | 0.29% of revenue (range 0.13% to 1.44%, n=5); casualty rate +7% (Marsh, Q2 2026) | RIMS total cost of risk is 1.0% of revenue, 3.4 times the portfolio median | consistent as an upper bound only The RIMS figure includes retained losses and administration, so it overstates the premium; the observed portfolio ratio is used and RIMS is kept as the ceiling. |
| Supplier concentration (eight companies without a supplier file) | McKinsey Global Institute: more than 40% of a year's profit lost per decade over a disruption every 3.7 years, scaled by a dependence factor of 0.25 (people and facility services) or 0.5 (equipment and consumables) | 14.8% of one year's EBITDA per disruption before scaling; resulting impacts 3.7% to 7.4% of EBITDA | Company-specific sole-source impacts from supplier files: sterling 15.2% of EBITDA; harvest 18.1% of EBITDA | consistent in size, not independent The two goods makers with their own supplier files sit at 15 to 18% of EBITDA per disruption, at or just above the 14.8% benchmark. Both are Kith's own one-lead-time calculation, so this is a consistency check, not independent evidence; the service companies are scaled down by judgment, so confidence is low. |
| Efficiency measures without a stated cost or saving (solar, HVAC saving, lighting, sub-metering) | Median cost and payback quartiles of the matching recommendation code in the DOE industrial assessment database | lighting 1.1 to 4.0 years (n=19,471); HVAC 2.3 to 7.0 (n=1,044); solar 6.2 to 14.9 (n=1,590); sub-metering 0.1 to 0.9 (n=28) | Paybacks computed by Kith from the lighting costs and savings two companies state: sterling 1.5 years; harvest 1.0 to 1.5 years | 2 of 2 conservative company paybacks sit inside the lighting range The comparison covers lighting only, because no company states a solar or HVAC saving; the benchmark is untested on those. |
| Water price (Harvest Ridge) | Median supply price of TN and KY plants in the DOE industrial assessment database | $4.16 per 1,000 gallons (n=186) | Context: Nashville raised rates 3% in 2026, the sixth straight annual rise; US typical combined bill +4.6% in 2024 (Bluefield) | small in any case Even doubling the price leaves the line under half a percent of EBITDA; sewer charges are excluded. |
| Patriot electric vehicles | Eight vehicles at the national average mileage, the signed 2025 gasoline price, EPA mpg and EV energy use; cost eight times the EV price gap | 260,780 miles per vehicle would be implied by the reported 76,700 gallons | FHWA average: 11,026 miles a year for cars, 11,360 for SUVs, pickups and vans | reported fuel does not fit eight vehicles The reported fuel is not used; the first move says to check the fleet's mileage first. |
| Reference input: DOE industrial assessment database, recommendation code 2.9114 | Quartiles of implementation cost over annual saving across the recommendations with both stated; median cost | n=1,590; median cost $344,510; payback 6.21 / 9.43 / 14.90 years (25th / median / 75th) | DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual saving | computed from the pinned file Recomputed on every run; nothing typed. |
| Reference input: DOE industrial assessment database, recommendation code 2.7232 | Quartiles of implementation cost over annual saving across the recommendations with both stated; median cost | n=1,044; median cost $21,464; payback 2.28 / 4.29 / 7.00 years (25th / median / 75th) | DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual saving | computed from the pinned file Recomputed on every run; nothing typed. |
| Reference input: DOE industrial assessment database, recommendation code 2.8117 | Quartiles of implementation cost over annual saving across the recommendations with both stated; median cost | n=28; median cost $3,000; payback 0.14 / 0.54 / 0.90 years (25th / median / 75th) | DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual saving | computed from the pinned file Recomputed on every run; nothing typed. |
| Reference input: DOE industrial assessment database, recommendation code 2.7142 | Quartiles of implementation cost over annual saving across the recommendations with both stated; median cost | n=19,471; median cost $4,082; payback 1.10 / 2.26 / 4.02 years (25th / median / 75th) | DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual saving | computed from the pinned file Recomputed on every run; nothing typed. |
| Reference input: industrial water price, Tennessee and Kentucky | Median of water consumption cost over usage across plants in the DOE database | $4.16 per 1,000 gallons; n=186; assessments FY2016 to FY2026 | DOE industrial assessment database (pinned reference file), assessments sheet: state, water consumption cost, water usage | computed from the pinned file Supply price only; sewer charges are not included, so the line is a floor. |
| Reference input: regular gasoline price | The signed 2025 weekly average of the EIA series 'Weekly U.S. Regular All Formulations Retail Gasoline Prices' (52 weeks) | $3.097 per gallon | the signed assumptions table (assumption G2-A8) and the pinned EIA weekly gasoline file | read from the signed assumption The same price the fleet-fuel measure at Clearview uses. |
| Reference input: commercial electricity price | The U.S. Total row of the EIA commercial price table | 14.53 cents per kWh | the pinned EIA average retail price table, U.S. Total row | read from the pinned file Used for the EV electricity cost. |
| Customer data requirement, Clearview | The company's own estimate of $2-3M of contract value forgone in 2025, valued at gross profit, recurrence Likely | $2.5M midpoint | Company states 40-50% of revenue comes from clients with environmental commitments: not used as a loss, only as context | company-stated Based on an observed loss, so more grounded than a share-of-revenue what-if. |
| Customer data requirement, Meridian | The two requesting clients at the average customer's size | 145 customers on $225M revenue; top customer 11% | Upper bound: two clients at the top-customer share = $50M | derived, low confidence The company states no figure, so the base is derived; the range is shown on the line. |