|Kith Consulting
← All documentsPortfolio edition · fictional client
01The answer

A ranked list of what to fix, what it costs and what it protects

All ten companies, one backlog, sized, with the cost to act beside the exposure. Move the exit year to see the book a buyer would look at by then; move the two thresholds to change where large and likely begin.

Report date October 9, 2026Ten companies, priority four marked ★† marks a Kith estimate: see the note at the foot of the page

02Fund timeline

Which companies exit when, and what each carries

Companies sit at their modelled exit: Kith's model, not a Northwood plan, and the earliest modelled date where a hold is a floor. The shaded band is the book at the chosen exit year; click a company for its page.

03Matrix

Likely and large, unlikely and large, likely and small

Each point is one exposure at one company: its chance over the remaining hold against its impact as a share of EBITDA. Dashed lines are the thresholds above. Carbon-price scenarios are not plotted: they overlap the energy line.

Hover a point for the fact behind it; click it for the company page.

04Backlog

What to do first

Quickest payback first, with revenue earned today ahead of revenue not yet won. Open a card for who decides, who delivers and the first move.

05Company page

One company at a glance

06Basis

How to read this page

Colour is what to do

Mitigate now. Likely and large. Capital and management time go here first.
Hedge or insure. Unlikely but large. Transfer the risk: insurance, hedges, contract terms.
Accept and monitor. Likely but small. Watch the trend; do not spend capital on it yet.
Deprioritize. Unlikely and small. Note it; revisit once a year.

Card colour is the type

Earns today. Revenue the company already books. Counted at exit.
Revenue not yet won. Not in earnings. Never counted at exit.
Efficiency measure. An energy or cost saving.
Not yet sized. No cost or saving stated yet.
Company plan. A growth plan the company has, not in earnings.

Grade key

AOfficial published data, or an actual from a system of record.
BA figure the company reported, an accounting estimate, or a value derived from A and B inputs.
CJudgment, a proxy, undated or simulated data. A Kith estimate: no outside source or company has confirmed it. Marked †.

The controls

Exit year picks which companies are in the book.
Large / likely move the cut-offs. They change no dollar figure.
Everything / half lost sizes the customer data exposure; half is a Kith illustration.
How the estimates were made and checked
EstimateHow it was madeWhat it rests onCross-checkResult
Insurance premium (four companies with no premium figure; Keystone uses its own $285,000 premium as the base; its $20K† line is the estimated increase)Median of the five portfolio companies that state a 2025 premium, as a share of LTM revenue, times the US casualty rate change, applied to the whole premium as an upper bound0.29% of revenue (range 0.13% to 1.44%, n=5); casualty rate +7% (Marsh, Q2 2026)RIMS total cost of risk is 1.0% of revenue, 3.4 times the portfolio medianconsistent as an upper bound only
The RIMS figure includes retained losses and administration, so it overstates the premium; the observed portfolio ratio is used and RIMS is kept as the ceiling.
Supplier concentration (eight companies without a supplier file)McKinsey Global Institute: more than 40% of a year's profit lost per decade over a disruption every 3.7 years, scaled by a dependence factor of 0.25 (people and facility services) or 0.5 (equipment and consumables)14.8% of one year's EBITDA per disruption before scaling; resulting impacts 3.7% to 7.4% of EBITDACompany-specific sole-source impacts from supplier files: sterling 15.2% of EBITDA; harvest 18.1% of EBITDAconsistent in size, not independent
The two goods makers with their own supplier files sit at 15 to 18% of EBITDA per disruption, at or just above the 14.8% benchmark. Both are Kith's own one-lead-time calculation, so this is a consistency check, not independent evidence; the service companies are scaled down by judgment, so confidence is low.
Efficiency measures without a stated cost or saving (solar, HVAC saving, lighting, sub-metering)Median cost and payback quartiles of the matching recommendation code in the DOE industrial assessment databaselighting 1.1 to 4.0 years (n=19,471); HVAC 2.3 to 7.0 (n=1,044); solar 6.2 to 14.9 (n=1,590); sub-metering 0.1 to 0.9 (n=28)Paybacks computed by Kith from the lighting costs and savings two companies state: sterling 1.5 years; harvest 1.0 to 1.5 years2 of 2 conservative company paybacks sit inside the lighting range
The comparison covers lighting only, because no company states a solar or HVAC saving; the benchmark is untested on those.
Water price (Harvest Ridge)Median supply price of TN and KY plants in the DOE industrial assessment database$4.16 per 1,000 gallons (n=186)Context: Nashville raised rates 3% in 2026, the sixth straight annual rise; US typical combined bill +4.6% in 2024 (Bluefield)small in any case
Even doubling the price leaves the line under half a percent of EBITDA; sewer charges are excluded.
Patriot electric vehiclesEight vehicles at the national average mileage, the signed 2025 gasoline price, EPA mpg and EV energy use; cost eight times the EV price gap260,780 miles per vehicle would be implied by the reported 76,700 gallonsFHWA average: 11,026 miles a year for cars, 11,360 for SUVs, pickups and vansreported fuel does not fit eight vehicles
The reported fuel is not used; the first move says to check the fleet's mileage first.
Reference input: DOE industrial assessment database, recommendation code 2.9114Quartiles of implementation cost over annual saving across the recommendations with both stated; median costn=1,590; median cost $344,510; payback 6.21 / 9.43 / 14.90 years (25th / median / 75th)DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual savingcomputed from the pinned file
Recomputed on every run; nothing typed.
Reference input: DOE industrial assessment database, recommendation code 2.7232Quartiles of implementation cost over annual saving across the recommendations with both stated; median costn=1,044; median cost $21,464; payback 2.28 / 4.29 / 7.00 years (25th / median / 75th)DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual savingcomputed from the pinned file
Recomputed on every run; nothing typed.
Reference input: DOE industrial assessment database, recommendation code 2.8117Quartiles of implementation cost over annual saving across the recommendations with both stated; median costn=28; median cost $3,000; payback 0.14 / 0.54 / 0.90 years (25th / median / 75th)DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual savingcomputed from the pinned file
Recomputed on every run; nothing typed.
Reference input: DOE industrial assessment database, recommendation code 2.7142Quartiles of implementation cost over annual saving across the recommendations with both stated; median costn=19,471; median cost $4,082; payback 1.10 / 2.26 / 4.02 years (25th / median / 75th)DOE industrial assessment database (pinned reference file), recommendations sheet: recommendation code, implementation cost, annual savingcomputed from the pinned file
Recomputed on every run; nothing typed.
Reference input: industrial water price, Tennessee and KentuckyMedian of water consumption cost over usage across plants in the DOE database$4.16 per 1,000 gallons; n=186; assessments FY2016 to FY2026DOE industrial assessment database (pinned reference file), assessments sheet: state, water consumption cost, water usagecomputed from the pinned file
Supply price only; sewer charges are not included, so the line is a floor.
Reference input: regular gasoline priceThe signed 2025 weekly average of the EIA series 'Weekly U.S. Regular All Formulations Retail Gasoline Prices' (52 weeks)$3.097 per gallonthe signed assumptions table (assumption G2-A8) and the pinned EIA weekly gasoline fileread from the signed assumption
The same price the fleet-fuel measure at Clearview uses.
Reference input: commercial electricity priceThe U.S. Total row of the EIA commercial price table14.53 cents per kWhthe pinned EIA average retail price table, U.S. Total rowread from the pinned file
Used for the EV electricity cost.
Customer data requirement, ClearviewThe company's own estimate of $2-3M of contract value forgone in 2025, valued at gross profit, recurrence Likely$2.5M midpointCompany states 40-50% of revenue comes from clients with environmental commitments: not used as a loss, only as contextcompany-stated
Based on an observed loss, so more grounded than a share-of-revenue what-if.
Customer data requirement, MeridianThe two requesting clients at the average customer's size145 customers on $225M revenue; top customer 11%Upper bound: two clients at the top-customer share = $50Mderived, low confidence
The company states no figure, so the base is derived; the range is shown on the line.
Method and caveats
  • Report date October 9, 2026. Impact is the effect on adjusted EBITDA in the year it occurs, against EBITDA for the twelve months to January 31, 2026 (data-room date). Modelled exit is the report date plus the remaining hold. It is Kith's model, not a Northwood plan: where the hold is a floor of one year (the window has passed or no date is stated) it is the earliest modelled date. Where Northwood's own exit plan differs, use that.
  • Large and likely follow Northwood's own scale at their defaults: High impact from 15 percent of EBITDA, Likely from a 35 percent chance over the hold. The sliders only change how points are classed; they change no dollar figure.
  • The exit-year control selects which companies are in the book (those exiting by that year). Totals are sums of company totals from the frozen model; carbon price is left out because it overlaps the energy line, and lines within a company are not independent.
  • Cost to respond to customer data requests is a Kith estimate, grade C, from two secondary benchmark pages and no independent project-fee check. Its value protected is an upper what-if: the whole exposed revenue treated as lost, not likelihood-weighted; the half is Kith's illustration.
  • Revenue not yet won means revenue the company has not yet won; it is not in LTM earnings and is not capitalised through the exit multiple. Earns today is revenue the company already books.
  • Efficiency measures are rated on the low end of savings and the high end of cost. The exit value effect is the annual saving times the company's exit multiple; whether a buyer pays that multiple on a saving only months old is the open question.
  • Dates that a company's file plans for an event (a contract renewal, a board pilot) are read on the data room's own clock, about January 31, 2026, and are shown as planned in the company's file; they are not tested against the report date. An event is treated as past only where it was already past on that clock.
  • Two small errors in the frozen data text are corrected on this page (a questionnaire line cite and a truncated clause). They are listed in the corrections file, and the data layer carries the earlier text until its next version.
  • The physical-weather lines of Keystone, NovaCare, Patriot, Pinnacle, Ridgeline and Trident were re-derived by an independent check script; the other lines are model-run. Derived energy is a low case (gas at the industrial price).
  • Where the data room gave no figure, the line is estimated and marked †: insurance premiums (the portfolio's observed premium ratio, a peer ratio the owner allowed, and the US casualty rate change), supplier concentration (a McKinsey Global Institute disruption benchmark scaled by a stated dependence factor), two customer data requirement lines derived from the company's own statements and customer counts, the Harvest Ridge water lines, and six efficiency measures sized from the DOE industrial assessment database. Each is cross-checked in the table on the exposure model page.
  • Patriot Staffing's files give two exit timings. The model uses the deal team's base case, the first half of 2029, because the 2027 to 2028 target needs EBITDA of $32M to $38M against $23.8M today, the add-on pipeline is paused, and the plan itself says the hold may run to Year 5 to 6.
  • Harvest Ridge's drought curtailment line rests in part on simulated plant values, by a specific exception to the rule that keeps simulated data out of other figures; the water price line uses only the company's reported 28 million gallons. The 2025 pressure drops, which the water authority attributed to demand and maintenance, are already the impact event in the weather line, so the two lines overlap in cause.