Baseline Climate Data Request: Sterling Precision Manufacturing
From: Sarah Mitchell, COO, Northwood Capital (prepared with Kith Consulting)
To: Janet Chen (CFO) and Derek Williams (COO)
Issue date: Monday, September 28, 2026 (planned)
Edition: Portfolio edition: Kith Climate cohort case, fictional client. The issue timetable is as planned in September 2026.
Status: As prepared for issue, September 2026
Why This Matters
Your questionnaire identifies Raytheon, L3Harris and Boeing Defense as customers asking for supplier carbon data, with Boeing Defense making it mandatory from 2027, across $25.0M to $42.0M of RFP opportunities. Defense primes assess this data at facility level and against source documents. This request is about making Sterling's figures hold up to that review, and building the baseline Northwood will use for Sterling's board materials.
What We Found in Your FY 2025 Submissions
We compared your carbon collection template with your climate questionnaire, figure by figure.
- Your two FY 2025 submissions (the carbon template and the climate questionnaire) agree exactly on every company total. That is a good starting point.
- At facility level they differ for all three plants, on both electricity (-13.7% to +34.0%) and gas (-24.0% to +68.1%). On-site diesel and propane are also allocated to different plants in the two submissions.
- The template records R-410A at Elyria only (15 lbs); the questionnaire reports 45 lbs across the three plants.
- The template lists three facilities (Akron, Elyria, Canton). Your add-on records place MicroTech Tooling in Wisconsin, which the template does not show.
- The template describes the Akron R-22 chillers as scheduled for replacement in 2026. The questionnaire describes the replacement as deferred and still being requested.
What You Have Already Provided
These are not requested again:
- Company totals for electricity, gas, on-site fuel and fleet fuel, which reconcile across both submissions.
- Fleet fuel volumes (about 12,000 gallons of diesel and 4,500 gallons of gasoline). We are asking only for the receipts behind them, not new figures.
- Your supplier list (15 suppliers). We are asking only for sourcing documentation behind it.
What We Need
Tier 2: confirms figures we will use provisionally (by Monday, October 12, 2026)
We will build your baseline on your submitted figures in the meantime and mark the affected items as provisional.
| Ref | What we need | What will satisfy it |
|---|---|---|
| SPM-1 | Utility invoices for FY 2025 by facility: Akron (Ohio Edison), Elyria (FirstEnergy), Canton (AEP Ohio) | 12 monthly invoices or an annual account statement per facility |
| SPM-2 | On-site diesel and propane by facility | Fuel delivery invoices or a facility-level fuel log |
| SPM-3 | R-410A system charges at Akron and Canton, and 2025 recharge (top-up) records for every refrigerant system | HVAC service records or refrigerant purchase log |
| SPM-4 | Fleet fuel receipts or fuel-card statements for FY 2025 | Fuel-card statements |
| SPM-8 | Confirm the list of facilities that operated in FY 2025 (the template lists Akron, Elyria and Canton), including whether MicroTech Tooling operates from separate premises, for example in Wisconsin, that are not in the template | A list confirming or correcting the three facilities, and energy and fuel data for any separate MicroTech premises |
Tier 3: needed for later work in this engagement (by Monday, October 12, 2026)
These inform the materiality, climate risk and disclosure work later in the engagement. Partial answers are welcome.
| Ref | What we need | What will satisfy it |
|---|---|---|
| SPM-5 | Whether the Akron R-22 chiller replacement is funded in the FY 2026 Budget (for Derek Williams, as the capex owner) | Budget line reference or management confirmation |
| SPM-6 | Sourcing documentation behind the existing supplier list | Supplier contracts, material certifications or supplier sustainability data where held |
| SPM-7 | Street addresses for all facilities | Address list |
Nothing in this request blocks your FY 2025 baseline. We will build it on your submitted figures and update it as the items above arrive.
How We Will Use It
- Your data is used for your company's baseline and Northwood's reporting only. It is not shared with other portfolio companies.
- Where an item hasn't arrived by the time the baseline is built, we use your submitted figures, mark them as provisional, and note what was assumed.
- If a document isn't available in the form described, send what you have and tell us what it covers. A partial answer by the date is more useful than a complete one later.
How to Respond
Reply to Sarah Mitchell, quoting the reference (for example, SPM-1) against each item. Files can be sent in any format. Questions on any item can go to Daniel Vetsko at Kith Consulting, who is preparing the baseline.
Portfolio edition — Kith Climate cohort case, fictional client