# Baseline Climate Data Request: Pinnacle Testing & Inspection

**From:** Sarah Mitchell, COO, Northwood Capital (prepared with Kith Consulting)
**To:** Frank Morrison (CEO) and Paul Stevens (President and COO)
**Issue date:** Monday, September 28, 2026 (planned)
**Edition:** Portfolio edition: Kith Climate cohort case, fictional client. The issue timetable is as planned in September 2026.
**Status:** As prepared for issue, September 2026

---

## Why This Matters

Your questionnaire notes refinery clients with about $18.0M of combined annual revenue now sending ESG questionnaires as part of contractor qualification. A clean, calendar-year baseline is the basis for answering them credibly, and for the board materials Northwood prepares for Pinnacle.

## What We Found in Your FY 2025 Submissions

We compared your carbon collection template with your climate questionnaire, figure by figure.

- All four energy and fuel totals match exactly between the carbon template and the questionnaire.
- The questionnaire lists 9 facilities and does not include Port Arthur; the template has 10, including Port Arthur.
- The questionnaire describes electricity as coming from utility bills. The template labels 8 of 10 facilities as accounting records.
- The questionnaire figures are 12-month trailing averages to November 30, 2025, and fleet diesel includes generator fuel.

## What You Have Already Provided

These are not requested again:

- Company totals for electricity, gas, fleet diesel and fleet gasoline, consistent across both submissions.
- Insurance premium history and the broker's 2026 renewal expectation.
- Weather disruption history with revenue impact.

## What We Need

### Tier 1: needed to build your FY 2025 baseline (by Monday, October 5, 2026)

Without these, part of your FY 2025 baseline would rest on figures that currently conflict or are missing.

| Ref | What we need | What will satisfy it |
|---|---|---|
| PTI-1 | Confirm the operating facility roster, including Port Arthur TX (in the template, not in the questionnaire's facility list) | Management confirmation with site list |

### Tier 2: confirms figures we will use provisionally (by Monday, October 12, 2026)

We will build your baseline on your submitted figures in the meantime and mark the affected items as provisional.

| Ref | What we need | What will satisfy it |
|---|---|---|
| PTI-2 | FY 2025 on a calendar-year basis (January to December), replacing the trailing 12 months to November 30, 2025 | Updated carbon template |
| PTI-3 | Source basis by facility: utility bills or accounting estimates; bills for the accounting-estimate sites | Utility invoices; short methodology note for any estimates |
| PTI-4 | Generator diesel separated from fleet diesel; confirmed vehicle count (32 or 35) | Fuel-card data by vehicle class; generator fuel log |
| PTI-5 | Refrigerant inventory for all sites: types, charges, 2025 recharges | HVAC service records |

### Tier 3: needed for later work in this engagement (by Monday, October 12, 2026)

These inform the materiality, climate risk and disclosure work later in the engagement. Partial answers are welcome.

| Ref | What we need | What will satisfy it |
|---|---|---|
| PTI-6 | Street addresses for all facilities | Address list |

## How We Will Use It

- Your data is used for your company's baseline and Northwood's reporting only. It is not shared with other portfolio companies.
- Where an item hasn't arrived by the time the baseline is built, we use your submitted figures, mark them as provisional, and note what was assumed.
- If a document isn't available in the form described, send what you have and tell us what it covers. A partial answer by the date is more useful than a complete one later.

## How to Respond

Reply to Sarah Mitchell, quoting the reference (for example, PTI-1) against each item. Files can be sent in any format. Questions on any item can go to Daniel Vetsko at Kith Consulting, who is preparing the baseline.

Portfolio edition — Kith Climate cohort case, fictional client