Week 2: Data audit

Reading view of a Markdown deliverable, shown as delivered. Download the Markdown file.

Presenter Script: Week 2 Climate Data Review for Sarah Mitchell (v1)

Portfolio edition: Kith Climate cohort case, fictional client. This is the script as used for the September 26, 2026 presentation of deck v2, built from memo v4. Later corrections are in memo v6 and deck v4.

Goes with: data-audit-deck-northwood-2026-09-v2-draft.html
Audience: Sarah Mitchell (COO). David Okafor and Lisa Brennan may join.
Length: about 20 minutes for pages 01 to 09, plus questions. Pages 10 to 12 are the cohort appendix; skip them with Sarah unless she asks how the work was done.
Source of every figure: memo v4 (data-quality-memo-northwood-2026-09-v4-draft.md). If asked for detail you don't have, say it's in the memo, section named below, and follow up.

Before you start:

The one message to leave her with: LP disclosure for FY 2025 is achievable once known errors are fixed. Buyer diligence isn't, and Meridian is the urgent case. Four answers from her on Monday keep Week 3 on schedule.


01 · Headline (about 2 min)

On screen: "Your protocol exists on paper. It hasn't run for 2026." On the right, all ten portfolio companies are ranked by readiness score, with a dotted line at 40, where Partially ready starts.

Say:

Point to: the green rungs. "Six companies are one named fix from the next band. The four amber ones need more than one fix."


02 · Act now (about 3 min)

On screen: four stepped cards ranked by value at stake, with a detail panel on the right. Point at each card in turn.

Say: "We ranked findings by what's at stake for Northwood, not by how messy the data is. Four issues have high value, a deadline within about a year, and a fix within reach."

  1. Meridian. Two CFO-signed submissions disagree on gas and fleet, and the exit plan's diligence scope has no ESG workstream. Fix: reconcile against utility invoices before the LOI. Owners: Patricia Wells (CFO) and Mark Sullivan (deal lead). Effort: low.
  2. Harvest Ridge. Its two submissions disagree on every total. About $34.0M of revenue from three top-10 customers needs Scope 3 data at 2027 renewals. Fix: one clean resubmission. Owner: the Harvest Ridge CFO (Thomas Nguyen, to be confirmed).
  3. Sterling. The totals match, but every facility figure conflicts. It has $25.0M to $42.0M of defense RFPs, and Boeing Defense makes carbon data mandatory from 2027. Fix: reconcile the facility split against the three utilities' invoices.
  4. Northwood's own LP letter. The protocol requires a climate section in the Q4 2026 letter, due mid-February 2027. Owners: Sarah and Jennifer Park (IR). Kith drafts it in Week 6.

If asked about other issues: "The memo also has a 'resource and plan' group (Harvest Ridge's supplier programme, Pinnacle's refinery clients, Ridgeline's services line) and a list of quick wins. Those are in the memo's 'Where Northwood's Attention Should Go' section."


03 · LP-readiness scores (about 2 min)

On screen: ten horizontal bars out of 100. Green means one fix reaches Partially ready; amber means it doesn't. The dashed marker is at 40.

Say: "All ten are in the same band, but some are much closer to moving. Sterling and Meridian are at 38. Harvest Ridge is lowest at 26, but one clean resubmission takes it to 40."

Click a bar to show the financial exposure behind that company's data.


04 · How the score works (about 2 min)

On screen: eight weighted dimensions on the left, the three bands on the right.

Say:

Likely question: "Why are Sterling and Meridian 2.5 points short?" "Their unrounded scores are 37.50. Both fell below 40 when we tightened a rule during the audit: naming someone who compiles data no longer counts as governance. Treat their band as a close call. The dimension profile is the more reliable read."


05 · Findings by company (about 4 min)

On screen: tabs for Meridian, Harvest Ridge, Sterling and Ridgeline, with short summaries of the other six below. Each finding is tagged Confirmed (from the files), Reported (the company's word) or Inferred (our interpretation).

Meridian tab: zero gas recorded at four sites where the questionnaire reports 12,500 therms, and 3,200 gallons of fleet fuel for a company that says it has no fleet.

Harvest Ridge tab: submissions differ by 14.6% on electricity, 18.7% on gas and 62.2% on fleet diesel. The board rates the customer requirement "Low-Medium" against about $34.0M of revenue.

Sterling tab: all six facility pairs conflict, and the R-22 chiller replacement has been deferred twice.

Ridgeline tab: its board has sized a sustainability services line at $1.5M to $8.0M a year, but it depends on the boundary decision on page 09.

The six summaries: mention two only.


06 · Three items can follow (about 1 min)

Say: "The memo has seven items for Northwood to confirm. Four are needed Monday and are on the last page. These three can wait: fuel-card classification (NW-3), who provided the physical-risk scores (NW-4), and the kickoff inputs we asked for (NW-6). None of them changes a Week 3 figure."


07 · Data requests and timeline (about 2 min)

On screen: a vertical timeline. Requests are issued Monday, September 28. Tier 1 is due Monday, October 5, and Tiers 2 and 3 on Monday, October 12.

Say:


08 · How this was built (about 1 min)

On screen: a ring of seven pipeline steps.

Say: "Every figure comes out of scripts that re-run from the raw files, and a final check re-runs everything before anything goes out. The scripts need only standard Python, so Northwood's own team can run the same process next quarter. That's the 'system that compounds' you asked for. The playbook moves to a Northwood location at the Week 6 handover."

Keep this short with Sarah. It's reassurance, not the point.


09 · Monday's decisions (about 3 min; end here)

Say: "Four answers from you on Monday keep Week 3 on schedule."

Close: "We scoped this for four companies and covered all ten at no extra cost. Whether six more CFOs hear from us this week is your call."


10 to 12 · Appendix (cohort review only)

Use these pages with Sarah only if she asks how the work was done.


Questions to be ready for

QuestionAnswer
"What happens to the Meridian deal if this isn't fixed?"Buyer questions under time pressure, a slower ESG workstream, possibly a specific representation. No price effect expected. Management time and credibility are the cost.
"Why not put a dollar figure on Meridian?"The risk is friction in diligence, not a calculable discount. EV conversions exist in our working files for discussion only; they aren't in the memo because full-loss figures would overstate the exposure.
"Have Patricia Wells and Mark Sullivan been told?"Don't guess. Confirm with Daniel before the meeting.
"Can we trust these numbers?"Every figure traces to a logged source. The questionnaires were transcribed twice and compared: 151 shared figures, 0 mismatches. A final script re-checks the memo and deck against the pipeline.
"Is Patriot's fleet really 42.5% of its footprint?"It's a Kith indicative estimate (EPA 2025 factors, US-average grid). It gets refined in Week 3. The fleet volume itself looks implausible for 8 vehicles, which is why it's a Tier 1 ask.
"When were the thresholds set?"The weights on September 22 and the materiality thresholds on September 25, both after we'd seen data. The memo says so. From next cycle they're set before any data is reviewed.